INDEMNIFICATION PROVISIONS DO NOT CREATE RECIPROCAL ATTORNEY’S FEES PROVISIONS
Posted on 3 November, 2018
In a good, recent decision, the Eleventh Circuit in International Fidelity Insurance Co. v. Americabe-Moriarity, JV, 2018 WL 5306683 (11th Cir. 2018), held that Florida Statute s. 57.105(7) cannot be used to shift attorney’s fees in a contractual indemnification clause in...
INSURER’S “FAILURE TO COOPERATE” DEFENSE
Posted on 26 October, 2018
If an insurer takes this position, it will typically be denying both defense and indemnification obligations, meaning the insured could be forfeiting coverage that otherwise exists through his/her/its failure to cooperate with the insurer. This defense by the insurer is not absolute as recently explained by the...
QUICK NOTE: UNENFORCEABLE LANGUAGE IN ARBITRATION PROVISION
Posted on 19 October, 2018
SERVING THE 558 NOTICE OF CONSTRUCTION DEFECT LETTER IN LIGHT OF THE STATUTE OF REPOSE
Posted on 13 October, 2018
Florida Statutes Chapter 558 requires a Notice of Construction Defect letter (“558 Notice”) to be served before a construction defect lawsuit is commenced. This is a statutory requirement unless...
NOTE ON FIRST-PARTY AND THIRD-PARTY SPOLIATION OF EVIDENCE CLAIMS
Posted on 7 October, 2018
In an earlier posting, I talked about spoliation of evidence. This posting discussed first-party spoliation of evidence which is where a party in a lawsuit has destroyed or lost...
About The Author
David Adelstein
Phone: (954) 361-4720
Email: Dadelstein@gmail.com
Pages
- About Me (David Adelstein)
- Bid Protests (Florida bid protests and Federal bid protests)
- Construction & Design Defects (and Florida Statutes Chapter 558)
- Construction Contracts
- Construction Liens
- Construction Safety, Workers Compensation Insurance, and Premise Liability Claims
- Delays, Acceleration, and Inefficiency (Lost Productivity)
- Insurance and Performance Bonds
- Payment Bonds Including Miller Act