DISPUTES WILL NOT BE SUBJECT TO ARBITRATION PROVISION IF THERE IS NO “SIGNIFICANT RELATIONSHIP”
Posted on 14 November, 2021
As you know from prior articles, arbitration is a creature of contract. This means if you want your disputes to be resolved by binding arbitration, as opposed to litigation, you want to make sure there is an arbitration provision in your contract. If there are certain types of disputes you...
SUBSTITUTING MATERIALS AND FAILURE TO COMPLY WITH CONTRACTUAL REQUIREMENTS
Posted on 7 November, 2021
It is important to remember that if you are going to substitute materials from those specified, you need to make sure there is proper approval in doing so--make sure to comply with the contractual requirements to substitute materials. Otherwise, you could be in a situation where...
MOVING FOR CERTIORARI RELIEF IF THE TRIAL COURT IMPROPERLY DISMISSES / DISCHARGES YOUR LIEN
Posted on 31 October, 2021
Your construction lien oftentimes is your leverage to secure payment because the lien collateralizes the amount you are owed against real property, a leasehold interest, or alternative security if the lien is transferred to alternate security. Having a court dismiss or discharge your construction lien claim is no...
COMMENCING OF THE STATUTE OF REPOSE FOR CONSTRUCTION DEFECTS
Posted on 24 October, 2021
Florida has a ten-year statute of repose which applies predominantly to construction defect claims. This can be found in Florida Statute s. 95.11(3)(c). After ten years, any rights relative to a construction defect claim are time-barred. However, the statute of repose date has...
WAIVING THE RIGHT TO ARBITRATE UNDER FEDERAL LAW
Posted on 17 October, 2021
If there is an arbitration provision in your contract that you want to enforce, you do not want to take action inconsistent with those rights as this could give rise to a waiver argument, i.e., that you waived your rights to arbitrate, particularly if the other...
About The Author
David Adelstein
Phone: (954) 361-4720
Email: Dadelstein@gmail.com
Pages
- About Me (David Adelstein)
- Bid Protests (Florida bid protests and Federal bid protests)
- Construction & Design Defects (and Florida Statutes Chapter 558)
- Construction Contracts
- Construction Liens
- Construction Safety, Workers Compensation Insurance, and Premise Liability Claims
- Delays, Acceleration, and Inefficiency (Lost Productivity)
- Insurance and Performance Bonds
- Payment Bonds Including Miller Act